4
Wire-neutral
provisional
✓ No loaded language, vague sourcing, or framing detected.
Santa Monica Pier Sign to be Removed for Bridge Overhaul
The 20-foot blue neon arch sign at Santa Monica Pier will be removed by the end of September 2026 as part of a $35.5 million bridge replacement project. The sign will be restored in Las Vegas and returned to its original location upon completion of the bridge, expected in late 2027. A half-scale replica will be available for visitors during the construction period.
Companies
Shimmick Construction Company
YESCO
Our neutral summary
The 20-foot blue neon arch sign at Santa Monica Pier will be removed by the end of September 2026 as part of a $35.5 million bridge replacement project. The sign will be restored in Las Vegas and returned to its original location upon completion of the bridge, expected in late 2027. A half-scale replica will be available for visitors during the construction period.
Read the full story at New York Post ↗
The reporting belongs to
New York Post;
we don't reproduce it.