The cost of a federal contract for work on the Lincoln Memorial's Reflecting Pool has increased to $14.7 million, according to federal records. The contract, held by Atlantic Industrial Coatings, has risen by more than $1.5 million from a previous total of $13.1 million reported a month ago, as indicated by a federal database updated on Thursday.
✓ No loaded language, vague sourcing, or framing detected.
Cost of Lincoln Memorial Reflecting Pool Contract Increases to $14.7 Million
The federal contract for the Lincoln Memorial's Reflecting Pool has risen to $14.7 million, reflecting an increase of over $1.5 million from the previous month's cost of $13.1 million. The contract is managed by Atlantic Industrial Coatings.
No note attached
on this article.
Original vs. Neutral
Reflecting Pool contract balloons up to $14.7M
Cost of Lincoln Memorial Reflecting Pool Contract Increases to $14.7 Million